PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Layed out gravel at Cafeteria (104), and Main Loby (102). Facing East (800x600).jpg Metal decking at 4th Floor Facing East (800x600).jpg Started fixing the main steel column Facing East  (800x600).jpg Started fixing the main steel column Facing South  (800x600).jpg Compacting around the foundation walls Facing South (800x600).jpg Installing underground piping at the boiler room Facing North  (800x600).jpg
Previous pageNext page Compacting around the foundation walls Facing South (800x600)
Compacting around the foundation walls Facing South (800x600)